












|
Check Valves
for sump pumps.
|
Installation Instructions:
PLEASE NOTE: This is a one way valve and needs to be installed top end up.
1. Threaded Model - Thread check valve into pump discharge, connect corrugated sump pump
hose kit or any type of existing pipe by clamping the coupling over the pipe and the top side of the check
valve. Tighten with hose clamps.
2. Basic Model - Install top up on the riser pipe. With two couplings, and four hose
clamps, assemble using one coupling and two hose clamps on each end.
|
Part No.
|
Description
|
|
CV-125T
|
1¼" MPT x 1½" or 1¼"
|
|
CV-150T
|
1½" MPT x 1½" or 1¼"
|
|
CV-150
|
1½" or 1¼" x 1½" or 1¼"
|
|
CV-200
|
2" x 2"
|
|
|
|