Skip to main content

Strong-Plug® Rapid-Acting Leak Stop Cement

final set
<1 min
psi compressive strength in 1 hour
1,000+
pull-out strength (ASTM C234)
14,000 lb
The Strong Company, Inc.
Fernco Infrastructure

Stop the water first

2 ways

Slurry or dry powder

2,500+ psi

In 24 hours

Strong-Plug 50 lb bucket

No loss

Sulfate resistant

100 cycles

Freeze/thaw tested

Five steps to a stopped leak

1

Clean

2

Open the crack

3

Mix

4

Apply and hold

5

Plug weep holes

After the leak stops

Strong-Seal QSR

Strong-Seal QSR

Strong-Seal QSR 50 lb bag
Strong-Seal liners

Strong-Seal liners

Strong-Seal MS-2C 60 lb bag

Meet Fernco Infrastructure

Specifications

Common questions

Slurry or dry?
How much do I mix?
Can I line right over it?
What about big leaks?
What weather can I apply it in?

Interested in carrying Fernco Infrastructure?

The Strong Company, Inc.

Strong-Seal

SealGuard

SealGuard

PipePatch

PipePatch

Documents

Got questions?