Menu
Manhole rehabilitation
Strong-Seal · Structure rebuild
A spray-applied calcium aluminate mortar that rebuilds heavily damaged manholes and structures to their original dimensions, with a smooth surface ready for a polymer topcoat.
Rebuild first, then coat. When a structure has lost a lot of material, a coating alone won’t fix it. Profile Plus restores structural integrity and the original dimensions, then gives the topcoat a smooth, sound surface to bond to.
Formulated to be coated 48 hours after the final application.
Sprays on vertical, horizontal and overhead surfaces, then trowels smooth.
PROFILE-PLUS 60 lb bag · 40 per pallet
Bonds to concrete, brick and masonry for a continuous surface.
Passes ASTM C666 with no damage, for cold-climate manholes.
Hydrogen sulfide in a sewer turns into acid that eats concrete. The more corrosion you see, the more acid-resistant the liner needs to be.
| Strong-Seal® liner | Rated to | Use it where | Made with |
|---|---|---|---|
| MS-2®A | pH 3.0 | No sign of H₂S corrosion | Portland cement |
| MS-2®C | pH 2.0 | Mild to moderate H₂S corrosion | Calcium aluminate cement |
| High Performance Mix | pH 1.0 | Severe H₂S corrosion | 100% pure fused calcium aluminate |
| Geopolymer | pH 1.0 | Large-diameter sewer and storm pipes and culverts | Fiber-reinforced geopolymer, 1″ minimum |
Profile Plus rebuilds the structure to its original dimensions so a polymer topcoat has a smooth, sound surface to bond to. When the cementitious liner itself is the finished protection, pick one of the liners above.
Lining storm culverts 24″ and larger? See Strong-Seal Storm Seal®.
Pressure wash to a sound surface, 3,000 psi minimum. Remove loose brick, mortar and concrete.
Stop active leaks with Strong-Plug®. Some leaks may need weep holes. Severe infiltration may need pressure grouting.
Start on a damp surface with no running water. Spray up to 1″ per pass, from the bottom up, to ½″ minimum. Trowel smooth, then wet brush.
Keep it damp for 72 hours if humidity is under 70%, or use an ASTM C309 curing compound. Cover the structure if more than 15 minutes pass between coats, and shade it in hot, dry weather. Topcoat 48 hours after the final pass.
Back in service: storm runoff and surcharge after 4 to 6 hours. Force main impact after 6 to 8 hours.
A liner is only as good as the surface under it. Stop active leaks first, then rebuild voids, benches and inverts, so Profile Plus goes onto a sound, damp surface. Two Strong-Seal products handle the prep, and you can line over both.
First, stop the leaks
Sets in under a minute and hardens on contact with water. Once it sets, you can line right over it.
See Strong-Plug ›
Then patch and rebuild
Fast-setting mortar for benches, inverts and voids. Final set in 15 to 30 minutes.
See QSR ›
An overview of our manhole rehabilitation and trenchless pipe repair solutions.
Technical data
| Part number | PROFILE-PLUS |
|---|---|
| Packaging | 60 lb bag, 40 bags per pallet |
| Compressive strength (ASTM C109) | Over 9,000 psi at 28 days |
| Flexural strength (ASTM C293) | Over 900 psi at 28 days |
| Tensile strength (ASTM C496) | Over 600 psi at 28 days |
| Bond strength (ASTM C882) | Over 2,000 psi at 28 days |
| Freeze/thaw (ASTM C666) | Pass, no damage, 300 cycles |
| Drying shrinkage (ASTM C596) | 0% at 28 days, 90% RH |
| Wet unit weight (ASTM C138) | 134 ± 5 lb/ft³ |
|---|---|
| Yield per bag | 0.54 ft³, or 12.8 ft² at ½″ thick |
| Made with | Calcium aluminate cement, pozzolans and masonry sand |
| Thickness | ½″ minimum total, up to 1″ per pass |
| Topcoat | Can be coated 48 hours after the final application |
| Water | 1.0 to 1.3 gallons per bag |
| Spray equipment | SprayMate® 35C, SprayMate® 35D or MiniMate II. For other equipment, check with our infrastructure team. |
| Typical structures | Manholes, tanks and containment, tunnels and pipelines, wastewater facilities |
FAQ
Use Profile Plus when you need to rebuild lost material and dimensions before a polymer topcoat. Use a Strong-Seal liner, such as MS-2®C or High Performance Mix, when the cementitious liner itself is the finished protection.
48 hours after the final application. Follow the topcoat maker’s surface prep instructions.
Up to 1″ per pass, starting from the bottom. The total thickness can’t be less than ½″, including at the invert or center of the floor.
Yes. It’s made for concrete and masonry structures, including brick. Remove loose and protruding brick and mortar before you line.
Storm runoff and surcharge after 4 to 6 hours. Force main impact after 6 to 8 hours.
Don’t apply below 40°F, on frozen surfaces, or if the surface could freeze within 24 hours. Keep the material under 90°F and the mix water under 80°F. Chill with ice if you need to.
Cast four 2″ cube samples each day, or for every pallet used, whichever comes first. Package, label and return them to the manufacturer for compressive strength testing per ASTM C109, following the owner’s or manufacturer’s directions.
For distributors
Fernco Infrastructure covers manhole, structure and pipe rehab with three product lines. Add them to your line card to serve municipal and contractor customers.
The Strong-Seal Profile Plus sell sheet with full specifications and application steps, plus the Fernco Infrastructure, Plumbing and WaterWorks catalogs.
Rebuilding a structure or writing a spec? Our infrastructure team can help. Reach out, or find your Fernco rep.