Skip to main content

Profile Plus Cementitious Liner

to topcoat after the final pass
48 hr
psi compressive strength at 28 days
9,000+
shrinkage at 28 days (ASTM C596)
0%
The Strong Company, Inc.
Fernco Infrastructure

Put back what the structure lost

48 hr

Ready for topcoat

3 ways

Walls, floors, overhead

Strong-Seal Profile Plus bag

2,000+ psi

Bond strength

300 cycles

Freeze/thaw tested

Pick the liner by the corrosion

Five steps to a rebuilt manhole

1

Clean

2

Stop leaks

3

Patch

4

Line

5

Cure

Before you line

Strong-Plug®

Strong-Plug®

Strong-Plug 50 lb bucket
Strong-Seal QSR

Strong-Seal QSR

Strong-Seal QSR 50 lb bag

Meet Fernco Infrastructure

Specifications

Common questions

Profile Plus or a liner like MS-2®C?
When can I topcoat?
How thick does it go on?
Does it work on brick manholes?
When can flow go back in?
What weather can I apply it in?
How is it tested on the job?

Interested in carrying Fernco Infrastructure?

The Strong Company, Inc.

Strong-Seal

SealGuard

SealGuard

PipePatch

PipePatch

Documents

Got questions?